Product Lifecycle Management with Michael Corr
Welcome, Michael Corr of Duro!
- Chris met Michael when he was still working at a drone startup in SF
- Wendover Productions video about drone delivery
- After that he did consulting for a while and then started Duro
- PLM stands for "Product Lifecycle Management". If you have used a system that has change orders, it was likely a PLM.
- Chris first experienced this as paper tracking at a co-op in mid 2000's
- Michael wants the process to be more like Pull Requests in software revision control.
- It can be tough dealing with binaries when doing revision control.
- There are other differences when comparing hardware vs software revision control.
- Separations of engineer from buyers means there's less insight into supply chain woes
- Purchasing changes once you go to production
- Michael got started in R&D at SRI (Stanford Research Institute)
- He then moved to a high volume manufacturing job and was surprised at the differences. Notably the cost benefit of spending time costing down a BOM another 10 cents.
- Chris maintains that this is why hardware engineers are cheapskates
- Another problem in the industry is that tools aren't interoperable, requiring meta layers like Duro.
- DFM and DFA are tough to do because there is a "wall" between manufacturing and engineering.
- Mechanical examples
- Michael says having quick iteration is another similarlity with a more desirable process: Agile feedback loops
- What does a release process look like?
- Where is the source of truth? To avoid the manufacturer using the wrong attachment, Duro sends a link instead of an attachment
- Tying into ERP systems that purchasing deparments might use.
- Tying into MES software package integrations for companies doing their own manufacturing (like on the shop floor)
- The problems are everywhere: big companies might be able to move faster, but it's by grinding with tools like spreadsheets
- When Michael moved to LA, he started mentoring at a hardware accelerator program
- When do people start using PLM systems? Chris thinks it should be "Two boards and an interconnect"
- Michael says it's important to start using PLM ASAP, at the very least to start using a part numbering system. This was a similar opinion that Jan Rychter (PartsBox) had about management systems.
You May Also Like

The House of Pod
Kaveh MD

Eye On The Sky
Vermont Public

The Swine Nutrition Blackbelt Podcast
Wisenetix

The 365 Days of Astronomy
365DaysOfAstronomy.org

Breaking Down: Collapse
Kory & Kellan

The Grave Talks | Haunted, Paranormal & Supernatural
Ghost Stores, Haunted, Paranormal & Supernatural Stories

Dr. Chapa’s OBGYN Clinical Pearls
Dr. Chapa’s Clinical Pearls

Real Ghost Stories Online
Real Ghost Stories Online | Paranormal, Supernatural & Horror Radio

The Science of Happiness
PRX and Greater Good Science Center

Stuff To Blow Your Mind
iHeartPodcasts
Community discussion