We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal. • community impact in Childress and local hiring • 750 MW campus scale with 500 MW operating • grid-connected power and 345 kV lines • substation readiness and long-lead equipment • air-cooled Bitcoin halls and noise control • onsite repair shop and uptime culture • closed-loop cooling, wells and water logistics • Microsoft five-year GPUs vs 20-year buildings • future-proofing for higher rack density • safety, security and site operations at scale Hit the like button if you're an iron shareholder, and feel free to subscribe Anthonys Info: Website: https://www.powermininganalysis.com X: https://twitter.com/cazenove_uk Patreon: https://www.patreon.com/Cazenove_UK Bryce's Info: X: https://twitter.com/McnallieM Patreon: https://www.patreon.com/McNallieMoney Merch: https://shop.mcnalliemoney.com/ Website: https://www.mcnalliemoney.com Business Inquiries: Email -
[email protected]